International Journal of Management and Applied Science (IJMAS)
.
Follow Us On :
current issues
Volume-10,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-10,Issue-1  ( Jan, 2024 )
  2. Volume-9,Issue-12  ( Dec, 2023 )
  3. Volume-9,Issue-11  ( Nov, 2023 )
  4. Volume-9,Issue-10  ( Oct, 2023 )
  5. Volume-9,Issue-9  ( Sep, 2023 )
  6. Volume-9,Issue-8  ( Aug, 2023 )
  7. Volume-9,Issue-7  ( Jul, 2023 )
  8. Volume-9,Issue-6  ( Jun, 2023 )
  9. Volume-9,Issue-5  ( May, 2023 )
  10. Volume-9,Issue-4  ( Apr, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 119
Paper Published : 5064
No. of Authors : 10503
  Journal Paper


Paper Title :
A Novel Multi-Objective Multi-Mode Multi-Skill Mathematical Model for Time Cost and Quality Trade-off in Project Scheduling

Author :Sina Zabihi, Nikbakhsh Javadian, Alireza Savari Choulabi, Mohammadamin Molaeialoucheh

Article Citation :Sina Zabihi ,Nikbakhsh Javadian ,Alireza Savari Choulabi ,Mohammadamin Molaeialoucheh , (2022 ) " A Novel Multi-Objective Multi-Mode Multi-Skill Mathematical Model for Time Cost and Quality Trade-off in Project Scheduling " , International Journal of Management and Applied Science (IJMAS) , pp. 43-51, Volume-8,Issue-10

Abstract : Abstract - In this paper, a novel multi-objective multi-mode multi-skilled project scheduling problem (MOMMMSPSP) with a time cost quality trade-off approach is proposed. In this problem, Each Activity can be performed in different executing modes, and each mode needs different requirements; requirements in this problem are different skills, which should be done by staff. Furthermore, staff members have various skills and specialties and can perform different skills in different activities. To model this problem, an integer linear programming formulation is proposed to optimize the objectives concurrently, including (1) minimizing total project completion time, (2) minimizing the total salary of the workforce involved in performing activities, and (3) maximizing the quality of workforce on performing skills of activities. Then Lp metric technique is utilized to transform the multi-objective problem to a single objective problem and find the optimal solution; thus, the proposed Lp metric model has been solved optimally by GAMS in small-sized. Analyzing the results showed that the optimal solution obtained from an Lp metric method in small-sized is optimal and reliable. Solving the model has created reasonable and feasible solutions for small-sized problems. The proposed model is firmly NP-hard, and bringing exact solutions is time-consuming. Keywords - Lp metric, Multi-Skilled Project Scheduling Problem, Multi-mode Resource Constraint Project-Scheduling Problem, Time Cost Quality Trade-off Problem.

Type : Research paper

Published : Volume-8,Issue-10


DOIONLINE NO - IJMAS-IRAJ-DOIONLINE-19263   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 32
| Published on 2023-01-25
   
   
IRAJ Other Journals
IJMAS updates
IJMAS -THANK YOU ALL FOR CONTRIBUTING YOUR PAPER TO IJMAS MAY ISSUE. ALL AUTHORS ARE REQUESTED TO GET THEIR HARD COPY NOW.
The Conference World
Facebook

JOURNAL SUPPORTED BY