Paper Title
Risk Management of Construction Sites in Bowin Area, Sriracha, Chonburi Province
Abstract
The purposes of this research were to identify risk factors in the areas of construction sites in Bowin area,
Sriracha, Chonburi which may affect the process of construction as well as to bring the results of study to analyze and
determine the risk control and risk management to reduce the risk and enhance the level of effectiveness. Data collection was
performed by collect data from 17 big construction projects in Sriracha. Only a manager with at least ten years of experience
would be included in sample group. From the 160 incidents, it found that there were 57 highest risk incidents, 44 high risk
incidents, 25 medium risk incidents, and 34 low risk incidents. The risk factors can be ranked by using high chance of
incidents occurred and high impacts: architecture, building components, building structure, document preparation, and
building contract.
Keywords- Risk Management, Construction Sites, Safety