International Journal of Management and Applied Science (IJMAS)
.
Follow Us On :
current issues
Volume-10,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-10,Issue-1  ( Jan, 2024 )
  2. Volume-9,Issue-12  ( Dec, 2023 )
  3. Volume-9,Issue-11  ( Nov, 2023 )
  4. Volume-9,Issue-10  ( Oct, 2023 )
  5. Volume-9,Issue-9  ( Sep, 2023 )
  6. Volume-9,Issue-8  ( Aug, 2023 )
  7. Volume-9,Issue-7  ( Jul, 2023 )
  8. Volume-9,Issue-6  ( Jun, 2023 )
  9. Volume-9,Issue-5  ( May, 2023 )
  10. Volume-9,Issue-4  ( Apr, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 119
Paper Published : 5065
No. of Authors : 10504
  Journal Paper


Paper Title :
Optimal Maintenance Service Contract for Repairable Equipment Involving Three Parties – Manufacturer, Agent and Customer

Author :Nur F. Sa’idah, Andi Cakravastia, U.S. Pasaribu, Bermawi P. Iskandar

Article Citation :Nur F. Sa’idah ,Andi Cakravastia ,U.S. Pasaribu ,Bermawi P. Iskandar , (2017 ) " Optimal Maintenance Service Contract for Repairable Equipment Involving Three Parties – Manufacturer, Agent and Customer " , International Journal of Management and Applied Science (IJMAS) , pp. 108-114, Volume-3,Issue-2

Abstract : Every engineering object (equipment or machine) is unreliable in a sense that it will degrade with age and/or usage, and eventually will fail. Maintenance actions are required to maintain a good condition of the engineering object. The engineering object of interest is heavy equipment used in an open coal mining such as dragline, dump trucks, excavators, etc. We consider that the heavy equipment is repairable and sold with warranty. Preventive maintenance (PM) and corrective maintenance (CM) actions are needed to keep the equipment in a satisfied condition. In some cases, PM is one package with warranty and hence the maintenance actions are borne by the manufacturer during the warranty, but after the warranty ends, they are borne by the customer (the owner of the equipment) and maintenance can be done in house or by outsource. As maintenance is not a core business of the mining company, often it is outsourced to an external agent (or original equipment manufacturer (OEM)). We examine a situation where the OEM offers PM and/or CM only in the warranty period and after the expiry of the warranty several maintenance options are offered by an agent. Hence, during a life cycle of the equipment, several combinations of maintenance service options offered by OEM and Agent are available for the customer to be selected. The decision problem for OEM or Agent is to determine the price of each option offered. In this paper, we construct a mathematical model that integrates the three decision problems using a Stackelberg game theory formulation. The optimal decision of the maintenance service contract for each party is obtained using a bi-level programming optimization with (i) upper-level problem for maximization manufacturer’s profit with related constrains (ii) lower-level problem for maximization agent’s profit with consumer’s utility function as constrains. Some numerical examples and managerial insights are presented to illustrate the decision problems studied in this paper. Keywords: Maintenance Service Contract, Three-parties, Bi-level Optimization, Reliability.

Type : Research paper

Published : Volume-3,Issue-2


DOIONLINE NO - IJMAS-IRAJ-DOIONLINE-7128   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 60
| Published on 2017-05-04
   
   
IRAJ Other Journals
IJMAS updates
IJMAS -THANK YOU ALL FOR CONTRIBUTING YOUR PAPER TO IJMAS MAY ISSUE. ALL AUTHORS ARE REQUESTED TO GET THEIR HARD COPY NOW.
The Conference World
Facebook

JOURNAL SUPPORTED BY