International Journal of Management and Applied Science (IJMAS)
.
Follow Us On :
current issues
Volume-10,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-10,Issue-1  ( Jan, 2024 )
  2. Volume-9,Issue-12  ( Dec, 2023 )
  3. Volume-9,Issue-11  ( Nov, 2023 )
  4. Volume-9,Issue-10  ( Oct, 2023 )
  5. Volume-9,Issue-9  ( Sep, 2023 )
  6. Volume-9,Issue-8  ( Aug, 2023 )
  7. Volume-9,Issue-7  ( Jul, 2023 )
  8. Volume-9,Issue-6  ( Jun, 2023 )
  9. Volume-9,Issue-5  ( May, 2023 )
  10. Volume-9,Issue-4  ( Apr, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 119
Paper Published : 5064
No. of Authors : 10503
  Journal Paper


Paper Title :
Solving Parallel Mixed-Model Assembly Line Balancing Problem under Uncertainty Considering Resource-Constrained Project Scheduling Techniques

Author :Masoud Rabbani, Farahnaz Alipour, Mahdi Mobini

Article Citation :Masoud Rabbani ,Farahnaz Alipour ,Mahdi Mobini , (2017 ) " Solving Parallel Mixed-Model Assembly Line Balancing Problem under Uncertainty Considering Resource-Constrained Project Scheduling Techniques " , International Journal of Management and Applied Science (IJMAS) , pp. 60-67, Volume-3,Issue-9

Abstract : When designing an assembly line, one of the most important and challenging problems is the line balancing problem. While considering the limitations of machinery in parallel mixed model line layouts, and probabilistic uncertainty of task durations, this study seeks to reduce the number of stations required in assembly lines. Being an NP-hard problem, the mathematical model cannot be solved to optimality for the real-world problems. A heuristic algorithm is used to solve the problem that takes advantage of the similarity of the assembly line balancing problem with the resource constraint project scheduling problem. The Particle Swarm Optimization algorithm is used to explore the feasible region. Monte-Carlo simulation method is applied to consider the uncertainties and their effect on the optimum number of stations. The proposed model and the solution method are evaluated by well-known data set available in the literature. Obtained results show the merits of the proposed model and the solution method. Keywords - Mixed-model Assembly Line, Balancing, Stochastic Optimization, Parallel Line, Resource Constraint Project Scheduling, Particle Swarm Optimization Algorithm

Type : Research paper

Published : Volume-3,Issue-9


DOIONLINE NO - IJMAS-IRAJ-DOIONLINE-9464   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 51
| Published on 2017-11-24
   
   
IRAJ Other Journals
IJMAS updates
IJMAS -THANK YOU ALL FOR CONTRIBUTING YOUR PAPER TO IJMAS MAY ISSUE. ALL AUTHORS ARE REQUESTED TO GET THEIR HARD COPY NOW.
The Conference World
Facebook

JOURNAL SUPPORTED BY